Rate Thread
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Raised main rotor - now rigging
#1
Hi All,

I just installed a new Peter K cog belt drive and had to raise the entire mast assembly 0.08 inches at the lower mast bearing (via a shim) to maintain specified clearance between the driven cog and the longitudinal square frame tube.

When I re-rig the controls I plan to simply adjust the length of the rod ends on the collective control rod to compensate and return the system to RW specs. Am I missing anything?

Thx!
Reply
#2
(01-21-2026, 08:55 PM)Tony Evans Wrote: Hi All,

I just installed a new Peter K cog belt drive and had to raise the entire mast assembly 0.08 inches at the lower mast bearing (via a shim) to maintain specified clearance between the driven cog and the longitudinal square frame tube.

When I re-rig the controls I plan to simply adjust the length of the rod ends on the collective control rod to compensate and return the system to RW specs. Am I missing anything?

Thx!
Reply


Forum Jump:


Recently Browsing 1 Guest(s)